NAVFAC Design-Build Model Request for Proposal - Small Project Template


NOTES:  For projects on a Multiple-Award Construction Contract (MACC) or Indefinite Quantity Indefinite Delivery (IDIQ) type contracts, this Part 2 may not apply, as the MACC or IDIQ contract requirements may take precedence. Confirm requirements with contracting officer.


NOTES:  The Small Project Template is typically applied to single-discipline (i.e., Mechanical repair projects with minor electrical work, or roof replacement projects) projects with a negotiated scope. For each project, determine whether the Small Project Template will be appropriate for the intended scope. Use the Standard Template for more complex projects (i.e., Any project with more than two architectural/engineering disciplines). All projects including work on fire protection or fire alarm systems must use the Standard Template. Use the Standard Template for all Third Party Certified (TPC) sustainable projects.

PART 2

GENERAL REQUIREMENTS

TABLE OF CONTENTS

6/23

  • 00 00 00 GENERAL REQUIREMENTS
  • 01 11 00 SUMMARY OF WORK
  • 01 14 00 WORK RESTRICTIONS
  • 01 20 00 PRICE AND PAYMENT PROCEDURES
  • 01 30 00 ADMINISTRATIVE REQUIREMENTS
  • 01 31 19.05 20 CONCEPT DESIGN WORKSHOP (CDW)
  • 01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
  • 01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
  • 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES
  • 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES
  • 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
  • 01 45 00 QUALITY CONTROL
  • 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
  • 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
  • 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Select a section below to continue browsing.

00 00 00 GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 31 19.05 20 CONCEPT DESIGN WORKSHOP (CDW)

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES

01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Previous Page