Comment on the WBDG

We will send your comments, along with a link to this page, to the appropriate project members. Your information will not be kept in our records or used for any other purpose than to send the message. Fields marked with an * are required.

Name:*
Organization:*
Email:*
Message:*
Security Code:* 
(Please enter the code in  
the box provided. This
protects the form from
abuse.)  



Download this document

NAVFAC Design-Build Model Request for Proposal - Marine Corps BEQ

Project Program

 

Project Title
P-00
FY0?
Category Code 000.00

 

Activity Location
City, State

 

Date


NOTE:  This is a hidden text note that will not print when the HIDDEN TEXT box on the Print tab under "Tools-Options" is unchecked.
Enter appropriate information such as the Project Title and location following the headings shown to the right.  These headings are right-justified text and the information entered should remain right justified.  Also enter Project title, location, and contract number information for page headers under the Header and Footer view.

 

 

 

 

 

 

 

 

 

 

TABLE OF CONTENTS



NOTE:  Enter the appropriate page numbers at the # symbols below.

COVER PAGE...........................................................#

 

TABLE OF CONTENTS..............................................#

 

1.  PROJECT DESCRIPTION.....................................#

 

2.  PROJECT OBJECTIVES........................................#

    2.1.  Mission Statement.......................................... 
    2.2.  Facility Function.............................................
    2.3.  Project Specific Priorities.................................
    2.4.  Appropriate Design........................................
    2.5.  Workflow Process...........................................   
    2.6.  Special Design Challenges...............................
    2.7  Adaptability and Flexibility................................  

3.  SITE ANALYSIS..................................................#

    3.1  Existing Site Conditions...................................   
    3.2  Site Development Requirements.......................

4.  BUILDING REQUIREMENTS...............................#

    4.1  Space Tabulation............................................   
    4.2  Space Relationships........................................   
    4.3  Exterior Character...........................................   

5.  ROOM REQUIREMENTS......................................#

 

6.  ENGINEERING SYSTEMS REQUIREMENTS..........#

    A10    Foundations................................................   
    A20    Basement Construction................................
    B10    Superstructure............................................   
    B20    Exterior Closure..........................................   
    B30    Roofing......................................................   
    C10    Interior Construction...................................   
    C20    Stairs........................................................   
    C30    Interior Finishes.........................................   
    D10    Conveying Systems....................................   
    D20    Plumbing...................................................   
    D30    HVAC........................................................   
    D40    Fire Protection Systems...............................   
    D50    Electrical Power and Lighting.......................   
    E10    Equipment.................................................   
    E20    Furnishings................................................   
    F10    Special Construction....................................    
    F20    Selective Building Demolition........................   
    G10    Site Preparations........................................   
    G20    Site Improvements.....................................   
    G30    Site Mechanical Utilities...............................   
    G40    Site Electrical Utilities.................................    
    
Part 3 contains the project description, functional and performance requirements, scope items, and expected quality levels that exceed Part 4.  Part 4 identifies design criteria, verification requirements, and performance and quality requirements of products.  See "Order of Precedence" paragraph in Part 2 for relationships between all parts of this RFP.

Select a section below to continue browsing.

1.0 PROJECT DESCRIPTION

2.0 PROJECT OBJECTIVES

3.0 SITE ANALYSIS

4.0 BUILDING REQUIREMENTS

5.0 ROOM REQUIREMENTS

6.0 ENGINEERING SYSTEM REQUIREMENTS

Previous Page