NAVFAC Design-Build Model Request for Proposal - Marine Corps BEQ

3.0 SITE ANALYSIS


NOTE: This is a hidden text note that will not print when the HIDDEN TEXT box in "Print -Options" is unchecked.

This section includes the description of all site related information broken out into Existing Site Conditions and Site Development Requirements.

Provide graphics and photos on requirements that can be illustrated in this Section. Include large scale graphics, drawings, and field investigation reports for hazardous materials and substances as attachments in Part 6 of the RFP. Comply with UFC 3-810-01N, Navy and Marine Corps Environmental Engineering for Facility Construction for requirements on field investigations of hazardous materials and substances. Also enter Project title, location, and contract number information for page headers under the Header and Footer view.

3.1 Existing Site Conditions


NOTE:  The following outlines the types of information typically addressed.  Provide subheadings and information applicable to the project.

     3.1.1 Natural Constraints

        Topography
        Vegetation / Landscaping
        Natural Resources (Threatened and Endanger Species/Critical Habitat, Migratory Bird,
        Essential Fish Habitat, marine mammal restrictions, Bald and Golden Eagle nest
        location and restriction areas)
        Climatology (Solar orientation, etc.)
        Wetlands
        Reference Geotechnical Soils Report if applicable.
        Indicate environmental restrictions if applicable.
        Radon Contamination (Refer to EPA Radon Zone Map)
        Reference Wave, Current and Tide Reports if applicable
        Hydrographic Survey if applicable
        Unexploded Ordnance (UXO) Survey or Evaluation Reports if applicable
        Existing Waterfront Facility (above and underwater) Inspection Reports
        if applicable
        Coral or Other Marine Life Maps/Reports if applicable

     3.1.2 Man made

        Existing Vehicular Access and Circulation
        Site Utilities
        Site Drainage & Storm Water Runoff (hydrology)
        Existing Buildings (Provide photographs of buildings on site and
        surrounding buildings)
        Existing Waterfront Facilities (Wharf, Pier, Bulkhead, Caisson, Drydock, Mooring
        Dolphin, Mooring Island,  Boat Ramp etc. Provide photographs of waterfront site
        and surrounding waterfront facilities) if applicable
        Existing Mooring Hardware and Fender System (provide photographs of marine
        hardware and fender) if applicable
        Existing Dredging
        Hazardous Materials and Substances (asbestos containing materials, lead paint,
        polychlorinated biphenyls, low-level radioactive components, animal droppings,
        mold and spores, storage tanks, contaminated soil or groundwater, chlordane,
        or other hazardous materials and contaminates.)
        Fencing
        Adjacent Land Use
        Cultural Resources (historical, archeological)
        AICUZ / Explosive Arcs / HERO
        Permits

3.2 Site Development Requirements


NOTE:  The following outlines the types of information typically addressed.  Provide subheadings and information applicable to the project.

     3.2.1  Facility footprint

        Building Footprint
        
     3.2.2  Vehicular Access and Circulation

        Parking
        Service Access
        Pedestrian Access and Circulation (flow, paths, sidewalks, etc.)
        Recreational
        Outdoor Activity Areas
        Landscaping
        Utilities
        Signage
        Site Drainage & Storm Water Runoff (hydrology)
        Dewatering
        Site / Building Demolition
        Site Clearing
        Fencing (perimeter security)  
        Construction Access / Lay down Area
        Permits
        Sustainable Development
        Antiterrorism Force Protection (ATFP)
        Architectural Barriers Act (ABA) Requirements
        Master Planning
        Environmental Assessment (Constraint in the EA not the entire EA)