NAVFAC Design-Build Model Request for Proposal - Standard Template

2.0 PROJECT OBJECTIVES

2.1 Mission Statement


NOTE:  Provide a clear concise description of the facility's mission in support of the activity's and Installation's mission. Utilize the actual users mission statement where ever possible.

2.2 Facility Function


NOTE: Provide a statement that identifies the basic functions provided by the new or renovated facility.

2.3 Project Specific Priorities


NOTE:  Include items that are of Primary importance to the activity/user.
 
Coordinate with the Contracting Officer to ensure that these priorities are reflected in the Technical Evaluation Factors in the Source Selection Plan and Section 00202.


NOTE: For waterfront projects, provide requirements of maintaining wharf operation or waterway access if applicable.

2.3.1 Sustainable Design and Construction


NOTE: All NAVFAC projects are subject to sustainable design criteria. Editor notes in UFGS Section 01 33 29.05 20 Sustainability Reporting for Design Build prescribe sustainability goals based on project scope. Edit and incorporate UFGS section 01 33 29.05 20 Sustainability Reporting for Design Build and associated requirements into this project. Then carefully edit RFP Part 2 and Part 3 sections based on requirements established in Section 01 33 29.05 20.

Design and construct project per sustainability requirements identified in Section 01 33 29.05 20, Sustainability Reporting for Design-Build. Additional specific sustainability requirements are found in RFP Part 2, Part 3, and Part 4 sections.

Design and construct project per UFC 1-200-02 High Performance and Sustainable Buildings.

2.3.2 Storm Water Management - Low Impact Development (LID)

NOTE: Low Impact Development (LID) is required to be implemented in accordance with DoD and Navy LID Policy.  LID is a form of storm water management that infiltrates stormwater into the ground close to its source. 

In January 2010, Deputy Under Secretary of Defense, issued Department of Defense (DoD) policy on implementation of storm water requirements under EISA Section 438.  This policy directs DoD to implement EISA Section 438 EPA technical guidance in accordance with DoD Policy on Implementing EISA Section 438.  UFC 3-210-10, Low Impact Development, was developed to provide the minimum technical requirements to comply with DoD Policy on implementation of storm water requirements under EISA Section 438.

In November 2007, Assistant Secretary of the Navy issued Navy Low Impact Development (LID) Policy for the Navy and Marine Corps.  This policy set a goal of no net increase in storm water volume and sediment or nutrient loading, required annual reporting, and establishment of a waiver process.  It is applicable to new construction projects greater than $750,000 and renovation projects with a stormwater element greater than $5,000,000.

Use UFC 3-210-10 and FC 1-300-09N to comply with DoD and Navy LID Policy.

Some LID features will be associated with the building (i.e., vegetated roof, rainwater harvesting).  Coordinate requirements for those systems in other parts of this RFP.

Comply with UFC 3-210-10, Low Impact Development and FC 1-300-09N Navy and Marine Corps Design Procedures.  Additional specific LID and stormwater management requirements are found in RFP Parts 3 and 4, Section G30.  In addition to LID, comply with State and Local stormwater regulations.

2.3.3 Energy Efficiency

Energy efficiency must be in accordance with UFC 1-200-02, High Performance Sustainable and Building Requirements.

2.3.4 Building Commissioning

Provide commissioning to meet requirements identified in UFGS Section 01 33 29.05 20 Sustainability Reporting For Design-Build, UFGS Section 01 45 00.05 20 Design and Construction Quality Control, and UFC 1-200-02 High Performance and Sustainable Building Requirements.

2.3.5 Accessibility Requirements

Provide barrier-free design in accordance with UFC 1-200-01, General Building Requirements.

2.3.6 Antiterrorism Criteria


NOTE: UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings establishes standards that provide minimum levels of protection against terrorist attacks for the occupants of all DoD inhabited buildings.  A DoD building is any building or portion of a building (permanent, temporary, or expeditionary) owned, leased, privatized, or otherwise occupied, managed, or controlled by or for DoD.  DoD buildings are categorized within these standards as low occupancy, inhabited, primary gathering, high occupancy family housing, and billeting.  See UFC 4-010-01, Appendix A for definitions.
 
UFC 4-020-01, DoD Security Engineering Facilities Planning Manual presents processes for developing the design criteria necessary to incorporate security and antiterrorism into DoD facilities and for identifying the cost implications of applying those design criteria.  Those design criteria may be limited to the requirements of the minimum standards (UFC 4-010-01), or they may include protection of assets other than those addressed in the minimum standards (people), aggressor tactics that are not addressed in the minimum standards or levels of protection beyond those required by the minimum standards.  Discuss/consult with regional/base security personnel and or antiterrorism officer (ATO) for possible considerations of an increased threat or level of protection beyond the scope of the minimum standards.
 
RFP developer will designate facility occupancy per UFC 4-010-01.


NOTE: Refer to UFC 4-010-01 for occupancy definitions.  If occupancy is family housing or low occupancy, keep and edit the first bracketed sentence and delete the remainder of the section.  If occupancy is inhabited, primary gathering, billeting, or high occupancy family housing, delete the first bracketed sentence and edit the remainder of section.

[Facility will have an occupancy designated as [family housing][low occupancy] and UFC 4-010-01 does not apply.]

[Design the facility to comply with UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.

Facility will have an occupancy designated as [inhabited][primary gathering][billeting][high occupancy family housing] in accordance with UFC 4-010-01.


NOTE: If it can be determined that the building will be 3 stories or more, progressive collapse avoidance would be a design requirement.  If it will be up to the contractor to determine, delete the next two bracketed sentences.

[Facility will be less than 3 stories and will not be required to meet the progressive collapse avoidance standards.]

[Facility will be 3 stories or greater and will be required to meet the progressive collapse avoidance standards.]


NOTE: The most cost-effective solution for mitigating explosive effects on buildings is to keep explosives as far as possible from them.  Standoff distance must be coupled with appropriate building hardening to provide the necessary level of protection to DoD personnel.  Standoff distance is defined as a distance maintained between a building or portion thereof and the potential location for an explosive detonation.  The two limits for standoff are identified as conventional construction standoff distance which is the standoff distance at which conventional construction may be used for buildings without a specific analysis of blast effects, except as other wise required in UFC 4-010-01 and minimum standoff distance which is the smallest permissible standoff distance regardless of any analysis or hardening of the building.

Facility is [within][without] a controlled perimeter.

Facility minimum standoff distance is [__] meters [__] feet from parking and roadways.

Facility conventional construction standoff distance is [___] meters [___] feet from controlled perimeter.

[Develop the site to provide the standoff requirements listed in UFC 4-010-01.][The site is constrained and the conventional standoff distances are likely not available.  Standoff distance may be reduced, but not less than the minimum standoff, if the required level of protection can be achieved through analysis, building hardening, or other mitigating construction as described in UFC 4-010-01.]

2.3.7 Cybersecurity

All control systems (including systems separate from an energy management control system) must be designed, acquired, and executed in accordance with DoD Instruction 8500.01, DoD Instruction 8510.01, and as required by individual Facilities Engineering Command (FEC) or Installation implementation policy.

Incorporate ICS Security Controls located in NIST 800-82, Appendix G, Table G-1.


NOTE:  The "Smart Grid Industrial Control System Baseline Procurement Guidance" document is utilized by NAVFAC Marianas to insert cybersecurity requirements into project requirements.  A Tri-Service guide specification for 'Cybersecurity of Facility Control Systems' will be developed in FY16 that will address DoDI 8500.01 and DoDI 8510.01 for design and construction of military construction projects.  Until that is finalized and available, consider utilizing the "Smart Grid Industrial Control System Baseline Procurement Guidance" document in coordination with the FEC and PWD CIO.

[Incorporate cybersecurity requirements in accordance with "Smart Grid Industrial Control System Baseline Procurement Guidance" located in Part 6 "Attachments" into project facility control systems identified in:

[ESR D10, CONVEYING]

ESR D30, HVAC

ESR D50, ELECTRICAL]

[ 2.3.8 Secured Areas


NOTE:  Use the following guidance to determine which reference standards are applicable to the project. Choose the appropriate reference standards in the following paragraph and delete non-applicable standards.

  • SCIF: use bracketed option referring to Intelligence Community Standard (ISC) Number 705-1
  • Secret, Top secret, or controlled access areas (CAA): use bracketed option for SECNAV M-5510.36 Department of Navy Information Security Program
  • Arms, ammunition, and explosives (arms rooms, Armories, and magazines): use bracketed option for OPNAV Instruction 5530-13C Department of the Navy Physical Security Instruction for Conventional Arms, Ammunition, and Explosives
  • SAPF: use bracketed option for JFAN 6/9 Manual Physical Security Standards for Special Access Program Facilities.

Provide [a secured area] [secured areas] [with-in the] building that complies with the [Intelligence Community Standard (ICS) Number 705-1] [SECNAV M-5510.36 Department of Navy Information Security Program] [OPNAV Instruction 5530-13C Department of the Navy Physical Security Instruction for Conventional Arms, Ammunition, and Explosives] [JFAN 6/9 Manual Physical Security Standards for Special Access Program Facilities].


NOTE: List all spaces in the first bracketed paragraph below that are to be enclosed in the secured area and also list spaces that are to receive a higher level of security with-in that secured perimeter.

If drawings of the secured areas are provided as part of the RFP, indicate the perimeters of the secure areas and delete the first bracketed paragraph below. If there is more than one area or type of area to be protected, separately identify each area.

NOTE: Coordinate these spaces with the RFP Part 3, Chapter 5 - Room Requirements sheets. Designate in the Room Requirement sheets the minimum STC rating, minimum wall construction type (standard, enhanced, or  vault), and other unique requirements for each room. Coordinate the appropriate requirements of the secured areas with all engineering disciplines.

[Provide accredited secured areas to include the following space(s):  [____], [____], and [____].  The outside perimeter of these spaces defines the secured area and provide [standard] [enhanced] [vault] construction with an STC rating of [___]. [The following space(s): [____], [____], and [____], are a higher rated secured area within the secured perimeter area defined above. Provide the higher rated secured perimeter with [standard] [enhanced] [vault] construction and a STC rating of [___].] The wall construction and STC rating of shared walls between the secured perimeter and the higher rated secured area is determined by the higher rated secured area requirements.

[Provide accredited secured area(s) that are indicated in the drawings of this RFP.]

Refer to the RFP Part 3, Chapter 5 - Room Requirements to further define the secured area requirements.

] 2.4 Appropriate Design


NOTE:  Provide a description of the appropriate level of architectural refinement including building type, character, style, historic, and economic considerations.  Describe in general if special scale, finishes, and materials are required for architectural significance.


NOTE: For Historic Projects
 
Include project specific information here for Historic Preservation or National Capital Planning Commission requirements in this paragraph.  Coordinate this information with the submission requirements in UFGS section 01 33 10.05 20, Design Submittal Procedures and FC 1-300-09N, Navy and Marine Corps Design Procedures.


NOTE:  For waterfront projects, suggest to use the following:
 
The Government is interested in a best value proposal that supports the functional needs of the user and activity.  The levels of quality and durability specified must be responsive to the function, mission effectiveness, and cost effectiveness of a strategically important and high use military facility expected to provide many years of service.


NOTE:  If a project-type UFC exists for this facility type, include the following sentence and insert the applicable UFC number and title.

[Comply with [UFC ________, Title] for planning and design requirements for this project.]

2.5 Workflow Process


NOTE: Describe the use patterns of the occupants of the facility. Include the staffing and Hours of Operation.


NOTE:  For waterfront projects, describe existing and planned wharf operation, restrictions and limitations.   If project site is within the ESQD arc, describe operation/occupancy restrictions related to ESQD.

2.5.1 Hours Of Operation


NOTE: For wharf handling ordnances, suggest to use the following:
"Wharf operation, including ordnance handling, typically take place under daylight conditions.  During periods of high activity, operations are conducted around the clock.  The level of activities will be dictated by events occurring worldwide.  This unpredictable nature of world events can cause scheduling problems, delays, and difficulties in the construction of this project."

2.5.2 Staffing/Occupancy

The number of occupants specified in the RFP are identified for programming purposes. Occupancy used to design building features, such as structural, egress, and plumbing fixtures must be determined as required in applicable building or life safety codes.


NOTE: Table is Optional. Staffing could be described in words.

Type of OccupancyNo. of PersonsDescription of Activity
     
     
     

 

Maximum Occupancy## 
     
     
     

2.6 Special Design Challenges


NOTE: If applicable, describe any special design challenges.  Identify the most difficult site and project specific issues in the design solution for this project.  Note -These items could be used in the technical evaluation factors to evaluate the proposal.


NOTE:  For waterfront projects, provide the following detailed requirements if applicable:
 
(1) Planned phasing to maintain existing wharf operation and designated construction access routes and construction areas during each phase; (2)  Ordnance handling/ESQD restrictions during construction; (3) Waterway restrictions during dredging and other in-water construction; (4) Special geotechnical conditions (high seismic, high liquefaction potential, etc.) that are unique to the waterfront facility site, (5) Special conditions on existing waterfront facilities.

2.7 Adaptability And Flexibility


NOTE: If required, describe any need for flexibility for change of use or any adaptability for future expansion.


NOTE:  For waterfront projects, describe provisions for future wharf extension, water deepening, change of operation, accommodation of different design vessels etc.  Also, provide information on other on-going or planned waterfront projects that may impact the contractor’s design and construction.

Previous Page