Comment on the WBDG

We will send your comments, along with a link to this page, to the appropriate project members. Your information will not be kept in our records or used for any other purpose than to send the message. Fields marked with an * are required.

Name:*
Organization:*
Email:*
Message:*
Security Code:* 
(Please enter the code in  
the box provided. This
protects the form from
abuse.)  



Download this document

NAVFAC Design-Build Model Request for Proposal - Marine Corps BEQ

F10 SPECIAL CONSTRUCTION


SYSTEMS REQUIREMENTS
SPECIAL CONSTRUCTION TEMPLATE 02/18

Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements. This template is for Group Element F10-SPECIAL CONSTRUCTION. Text such as this is hidden text that will not print when the hidden text box in "Print/Options" is un-checked.

The Architectural or Structural Member must edit this template for the requirements of the project. The SYSTEMS REQUIREMENTS are intended to define items that are required throughout the facility or on a system wide basis that is common to several rooms. Room-specific requirements are defined in the Part 3 Chapter 5 ROOM REQUIREMENTS section. Coordinate with the lead programmer for ROOM REQUIREMENTS. Editing is required where brackets [ ] appear. Delete all building elements that are not required for the project. If additional elements or sub-elements are required for the project that do not appear in the template, refer to the NIST UNIFORMAT II publication for additional building element numbers and descriptions. The Uniformat II Work Breakdown Structure can be found at www.wbdg.org/ndbm/. Coordinate with the PERFORMANCE TECHNICAL SPECIFICATION SECTION F10 to ensure that performance requirements are provided for all of the Building Elements listed here and that paragraph numbering matches.


NOTE:  Edit the following paragraphs to suit the project, or create your own, to describe the SPECIAL CONSTRUCTION for the project.  Special construction that is typically included in a construction contract includes sound conditioned rooms, bullet-resistant protection, Sensitive Compartmented Information Facilities (SCIF) and other special structures typically specified in Division 13 of CSI Masterformat.  Coordinate this section carefully with other portions of the RFP.

SYSTEM DESCRIPTION

Special Construction includes special construction systems.

GENERAL SYSTEMS REQUIREMENTS


NOTE: Consider the following paragraph for facilities that will include special construction systems.  Provide as detailed a list as can be obtained from the using activity.  This information could also be included in the Room Requirements.

F1030 SPECIAL CONSTRUCTION SYSTEMS

[The facility includes [__________ [s] to meet the requirements of [_____].

Previous Page