Comment on the WBDG
Comment On This Page
Download this document
NAVFAC Design-Build Model Request for Proposal - Entry Control Facility
D10 CONVEYING
SYSTEMS REQUIREMENTS
CONVEYING TEMPLATE 02/18
NOTE: On NAVFAC Installations, this building type does not typically utilize conveying systems. If project requirements identify the need for a multistory facility design or conveying systems, copy the applicable RFP Part 3 and RFP Part4 - D10/ Conveying requirements from the RFP Standard Template and include them in the project specific RFP. Edit RFP Part 3 to meet project requirements.
This facility type does not require conveying systems.
-- End of Section --