Comment on the WBDG

We will send your comments, along with a link to this page, to the appropriate project members. Your information will not be kept in our records or used for any other purpose than to send the message. Fields marked with an * are required.

Name:*
Organization:*
Email:*
Message:*
Security Code:* 
(Please enter the code in  
the box provided. This
protects the form from
abuse.)  



Download this document

NAVFAC Design-Build Model Request for Proposal - Entry Control Facility

4.0 BUILDING REQUIREMENTS


NOTE: This is a hidden text note that will not print when the HIDDEN TEXT box on the Print tab under "Tools-Options" is unchecked.
 
Include a summary listing of all the program spaces and relationships.  Sections include Space Tabulation, Space Relationships, and Exterior Character.  Also enter Project title, location, and contract number information for page headers under the Header and Footer view.


NOTE:  Building requirements shall be confirmed with Base Security and operations personnel at the RFP Development meeting.

4.1 Space Tabulation


NOTE:  The space tabulation is an overall list of rooms with their areas and limitations including other pertinent dimensional data. If this is a Military Construction project, the area is based on the 1391 congressional funding document and cannot be exceeded.  If less gross square footage is provided, it cannot be reduced by more than 25% of the 1391 space allowance. If reduction in programmed space is anticipated, it should be noted under this section.
 
The Space Tabulation data may be presented in an MS Word table inserted under this heading or as an embedded EXCEL table under this heading.  An EXCEL file that can be embedded here can be found on the NAVFAC Design-Build website at:  http://www.wbdg.org/ndbm/

[4.1.1    Gatehouse

             The Gatehouse shall be [__] sf. (m2)]
             [The Gatehouse shall include [a [__] sf. (m2) Personnel Office, ][a [__] sf. (m2) Electrical
             Room, ][and ][a [__] sf. (m2) lavatory.]

[4.1.2    Sentry/Guard Booth

             The Sentry/Guard Booth shall be [__] sf. (m2)]

[4.1.3    Overwatch Position]

             [The Overwatch Position shall include a [__] sf. (m2)
             Guard Room[ and a [__] sf. (m2) Storage/Equipment Room].

[4.1.4    Visitor Center]

             [The Visitor Center shall include[ a [__] sf. (m2) Waiting Area,][ a [__] sf. (m2) Service
             Counter,][ a [__] sf. (m2) Administrative Office,][ a [__] sf. (m2) Break Room,][ a [__] sf. (m2)
             Men's Lavatory,][ and][ a [__] sf. (m2) Women's Lavatory].

[4.1.5    Large Commercial Vehicle/Truck Inspection Facilities]

             [Inspection Office

                          The Inspection Office shall be [__] sf. (m2).]
                          [The Inspection Office shall include [a [__] sf. (m2) Personnel Office, ][a [__] sf. (m2)
                          Electrical Room, ][and ][a [__]sf. (m2) Unisex Lavatory.]

             [Inspection Building

                          The Inspection Building shall be [__]sf. (m2).]
                          [The Inspection Building shall include [ a [__] sf. (m2) Inspection Area,][ a [__] sf. (m2)
                          Personnel Office,][ a [__] sf. (m2) Electrical Room,][ a [__] sf. (m2) Waiting Area,][ and]
                          [ a [__] sf. (m2) Unisex Lavatory].]

4.2 Space Relationships


NOTE:  Include bubble diagrams, adjacency matrices, and/or block diagrams to explain functional relationships. Include narrative that explains adjacencies and organizational concepts.  Identify if project or certain portions will require ABA Accessibility Standards compliance.

[4.1.1    Gatehouse

             Gatehouse will not require ABA Accessibility Standards compliance.]

[4.1.2    Sentry/Guard Booth

             Sentry/Guard Booth will not require ABA Accessibility Standards compliance.]

[4.1.3    Overwatch Position

             Overwatch Building will not require ABA Accessibility Standards compliance.]

[4.1.4    Visitor Center

             Visitor Center will require ABA Accessibility Standards compliance.]

[4.1.5    Large Commercial Vehicle/Truck Inspection Facilities]

             [Inspection Office

                          [Truck Inspection Office will require ABA Accessibility Standards compliance.]
                          [Truck Inspection Office will not require ABA Accessibility Standards compliance.]]

                          [Inspection Building[Truck Inspection Building will require ABA Accessibility Standards compliance.]
                          [Truck Inspection Building will not require ABA Accessibility Standards compliance.]]

4.3 Exterior Character


NOTE:  Include text, graphics and photos that illustrate the desired requirements for exterior appearance.  Section should address BEAP or IAP (whichever is applicable), aesthetics and historical elements (as applicable).

[4.1.1    Gatehouse]

[4.1.2    Sentry/Guard Booth]

[4.1.3    Overwatch Position]

[4.1.4    Visitor Center]

[4.1.5    Large Commercial Vehicle/Truck Inspection Facilities]

             [Inspection Office]

             [Inspection Building]

Previous Page