Comment on the WBDG

We will send your comments, along with a link to this page, to the appropriate project members. Your information will not be kept in our records or used for any other purpose than to send the message. Fields marked with an * are required.

Name:*
Organization:*
Email:*
Message:*
Security Code:* 
(Please enter the code in  
the box provided. This
protects the form from
abuse.)  



Download this document

NAVFAC Design-Build Model Request for Proposal - Market Style BEQ

4.0 BUILDING REQUIREMENTS


NOTE: This is a hidden text note that will not print when the HIDDEN TEXT box on the Print tab under "Tools-Options" is unchecked.
 
Include a summary listing of all the program spaces and relationships.  Sections include Space Tabulation, Space Relationships, and Exterior Character.  Also enter Project title, location, and contract number information for page headers under the Header and Footer view.

4.1 Space Tabulation


NOTE:  The space tabulation is an overall list of rooms with their areas and limitations including other pertinent dimensional data. If this is a Military Construction project, the area is based on the 1391 congressional funding document and cannot be exceeded.  If less gross square footage is provided, it cannot be reduced by more than 25% of the 1391 space allowance. If reduction in programmed space is anticipated, it should be noted under this section.
 
The Space Tabulation data may be presented in an MS Word table inserted under this heading or as an embedded EXCEL table under this heading.  An EXCEL file that can be embedded here can be found on the NAVFAC Design-Build website at:  http://www.wbdg.org/ndbm/.  The files are included in Part 4 for the Standard Template and each Model Facilities-Type Template when you choose to download the .zip file of the entire template.

Space Tabulation

Space Name# of SpacesUnit SF (Net)Total SF (Net)Total SM (Net)# of OccupantsRemarks
Vestibule 1 60 60 5.57    
Lobby 1 200 200 18.58    
Waiting Area 1 120 120 11.15    
Administrative Office 3 100 300 27.87   One - 100sf cubicle per administrator
Mechanical Room 1 400 400 37.16    
Electrical Room 1 260 260 24.15    
Fire Pump / Sprinkler Room 1 180 180 16.72    
Mail Room 1 120 120 11.15    
Telecommunications 1 80 80 7.43    
Custodial Space 1 100 100 9.29   Includes facility laundry
Trash / Recycling Room 1 300 300 27.87   Locate as close as possible to
Bulk Storage Room 200 28 5600 520.26   1-16 square foot cage per permanent resident + circulation
Public (Unisex) Toilets 2 140 280 26.01    
Telephone Alcove 1 56 56 5.20    
Community / Game Room 1 700 700 65.03   28 x 25 room approximately 40 people + games
Pool Toilet / Shower Utility Room 1 120 120 11.15    
Vending Room 1 150 150 13.94   4 vending machines - adjacent to Game Room
2-Bedroom Apartment 200 900 180000 16722.55    
    Subtotal Net Area 189026 17525.79    
    Net to Gross Factor 1.25 1.25    
    Total Gross Area 236283 21907.23    

The Design-Building Contractor shall provide actual area in both square feet and square meters in proposals.

See attachment(s):

4.2 Space Relationships


NOTE:  Include bubble diagrams, adjacency matrices, and/or block diagrams to explain functional relationships. Include narrative that explains adjacencies and organizational concepts.  Identify if project or certain portions will require ABA Accessibility Standards compliance.

4.3 Exterior Character


NOTE:  Include text, graphics and photos that illustrate the desired requirements for exterior appearance.  Section should address BEAP or IAP (whichever is applicable), aesthetics and historical elements (as applicable).

[The exterior appearance shall be compatible with building’s adjacent to the site.]  [The design shall be in conformance with the Base Exterior Architecture Plan (BEAP).]

[The primary exterior material of the building shall be [brick] [].]  [The roof shall be [metal] [].]

Previous Page